A highly motivated and detail-oriented Construction Engineer with passion for the construction industry and over 13 years of extensive experience handling various challenging office and site tasks with ability to cope with high stress situations and dedication to meet all project timeline goals and budgetary requirements alongside a consistent track record of successfully implementing best practices to improve efficiency, reduce cost and increase productivity while maintaining strict adherence to high quality standards and safety practices.
Duties :
The rehab/renovation works include the following:
Project : Mall Of Oman
Project’s Cost: US$ 472,000,000.00/-
Client: Majid Al Futtaim (MAF)
The largest shopping mall in the Sultanate of Oman offering over 350 stores across 140,000sqm of gross leasable area including a 14,000sqm indoor Snowpark, VOX cinemas, Magic planet family entertainment center as well as 9000 sqm carrefour hypermarket and 5700 parking space.
Duties :
Project : Al-Amerat Wastewater Project - Contract A3 (AWP)
Project’s Cost: US$ 40,000,000.00/-
Client: Haya Water
The project comprises the construction of sewer network along with telecommunication ducting network and treated sewer effluent network with associated valve chambers.
Duties:
Project : Bausher Wastewater Network Project Contract No. B4 Qurum & Illam (BWN)
Project’s Cost: US$ 69,430,000.00/-
Client: Haya Water
The project consists mainly of the construction of 110 kilometers of sewers network with diameters ranges from 150mm to 700mm along with
telecommunication ducting network, 19 lifting and pumping stations with associated rising mains, 10 kilometers of pressurized treated sewer effluent TSE network and 500 meters of storm water channel.
Duties:
Project : A’ Seeb Sewage Collection and Conveyance
System – Contract 5B. (ASCS)
Client: Haya Water
Project’s Cost: US$ 165,040,000.00/-
The project comprises the construction of 500 kilometers of sewer network and accompanying fiber optic ducts with all associated manholes and chambers. It includes also the construction of 50 kilometers of pressurized transmission and distribution treated sewer effluent TSE network with all associated valves and flowmeters.
Duties :